How Aurora Organic Dairy used Westfalia AS/RS to streamline processes in two locations, helping deliver a higher quality product to its customers
June 29, 2022
Aurora selected Westfalia to design, manufacture and install a second AS/RS within their new Columbia cold-storage warehouse, whose location was a greenfield site, offering flexibility in square footage, capacity and solution design.
Martin’s Famous Pastry Shoppe Inc. finds the summer season really good for business—except mostly manual practices in the warehouse put a real crimp on the way the company would really like to handle the distribution side of its supply chain.
Graycor broke ground on the Shafter, Calif., distribution center in October 2018.
September 6, 2019
Graycor Construction Co., Oak Brook Terrace, Ill., topped out on the construction of a 628,713-square-foot high-capacity perishable distribution center for a big-box retailer.
The new warehouse will consist of an automated storage and retrieval system capable of handling 27,000 boxes in a 9-hour day with more than 37,000 box storage locations.
October 22, 2018
Creekstone Farms Premium Beef LLC broke ground on a new $35 million refrigerated distribution center at its Arkansas City, Kan., headquarters facility.
Built for large primary food processors, the Milmeq MFAST robotic storage and retrieval system sorts and prioritizes cartons of perishable chilled or frozen products as they enter the storage enclosure.
If run to failure is no longer an option, food and beverage processors have alternative ways to keep their equipment running at peak performance levels; they can plan maintenance schedules based on OEM suggestions.