Gray AES will continue to provide architecture, engineering, and automation and robotics solutions that have historically been provided by Gray AE, Gray Solutions, and InLine Engineers.
Integrated design-build firm A M King has begun a large-scale renovation of a Savannah, Ga.-area facility for MANA Nutrition Inc. that will produce the non-profit’s ready-to-use therapeutic food and ready-to-use supplemental food.
If you’ve ever played “Whac-A-Mole” on the boardwalk or at an arcade, you can get a sense of the frustration that both food and beverage processors and architecture/engineering/construction (AEC) firms are feeling in today’s economy—fix one problem, another pops up.
Setting an achievable ‘net-zero’ emissions goal is possible, however, it may require companies to lean less on renewables and more on a facility’s waste heat to make up the difference.
By now it’s clear that the major industries of the world must make radical changes to minimize the effects of climate change, and that includes revamping the thermal utilities that power our global food systems, which account for more than 34% of global greenhouse gas (GHG) emissions.